← Back to map

Ormesa I

Imperial County, California · EIA plant ID 50766 · Operator: Ormat Nevada Inc
GeothermalGeothermalCAISOBA: IID

×12 MW geothermal retired since 2020 (latest Jan 2025)

Nameplate19MWSummer 13 MW
Generators2in service
Net generation66GWh12 mo to Dec 2025
Capacity factor62%geothermal units, summer MW
Heat rate—thermal plants only
First online2003

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202561.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001115.462.0%—
2002124.166.7%—
2003125.667.5%—
2004133.271.4%—
2005125.767.5%—
2006129.469.6%—
2007131.470.8%—
2008120.664.8%—
2009129.569.7%—
201092.850.0%—
201194.650.9%—
20120.10.0%—
201384.844.4%—
201479.942.6%—
201570.237.4%—
20166635.1%—
201764.134.2%—
20188353.8%—
201964.742.0%—
202098.763.8%—
2021109.971.3%—
2022105.768.6%—
2023101.765.9%—
202470.250.0%—
202566.461.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ITLU1GeothermalBT128Jun 2003Operating—coming soon
OEC2AGeothermalBT74.7Feb 2025Operating—coming soon
ITLU2GeothermalBT128Jul 2003Retired Jan 2025—coming soon
OE1GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE10GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE11GeothermalST1.20.5May 1989Retired Sep 2003—coming soon
OE12GeothermalST1.20.5Dec 1986Retired Sep 2003—coming soon
OE13GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE14GeothermalST1.20.5May 1989Retired Sep 2003—coming soon
OE15GeothermalST1.20.5Dec 1986Retired Sep 2003—coming soon
OE16GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE2GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE21GeothermalST1.20.5May 1989Retired Sep 2003—coming soon
OE22GeothermalST1.20.5Dec 1986Retired Sep 2003—coming soon
OE23GeothermalST1.20.9Dec 1986Retired Jul 2008—coming soon
OE24GeothermalST1.20.5Dec 1986Retired Sep 2003—coming soon
OE25GeothermalST1.20.5Dec 1986Retired Sep 2003—coming soon
OE26GeothermalST1.20.9Dec 1986Retired Apr 2012—coming soon
OE27GeothermalST1.20.9Dec 1986Retired Sep 2003—coming soon
OE28GeothermalST1.20.9Dec 1986Retired Sep 2003—coming soon
OE3GeothermalST1.20.9Dec 1986Retired Sep 2003—coming soon
OE31GeothermalBT1.20.8Dec 1986Retired Jun 2018—coming soon
OE32GeothermalBT1.20.8Dec 1986Retired Jun 2018—coming soon
OE4GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE5GeothermalST1.21.1Dec 1986Retired Sep 2003—coming soon
OE6GeothermalST1.21.1Dec 1986Retired Sep 2003—coming soon
OE7GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE8GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon
OE9GeothermalST1.20.7Dec 1986Retired Sep 2003—coming soon

Owner / operator

Operator: Ormat Nevada Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ormat Nevada Inc100.0%19 MW

Nearby plants

Within 80 km.
Vikings Energy Farm287 MW1.9 km
Ormesa II24 MW3.2 km
Geo East Mesa II22 MW4.5 km
Geo East Mesa III46 MW4.5 km
Holtville30 MW12.3 km
Drop 420 MW12.8 km