Covanta Fairfax Energy

Fairfax County, Virginia · EIA plant ID 50658 · Operator: Covanta Fairfax Inc
OtherMunicipal Solid WastePJMBA: PJM
Nameplate124MWSummer 98 MW
Generators2in service
Net generation653GWh12 mo to Aug 2026
Capacity factor75%other units, summer MW
Heat rate18,663Btu/kWhfossil units, electric fuel, HHV
First online1990

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202574.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
16,00017,00018,00019,0002005201020152020202518,663 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001596.786.2%—
2002623.590.1%—
2003622.489.9%17,559
2004634.891.4%18,659
2005604.686.8%17,830
2006617.388.8%18,088
2007612.370.8%18,470
2008588.768.4%18,352
2009594.368.8%18,830
2010560.965.0%19,583
2011600.169.7%19,054
2012580.567.3%18,692
2013557.863.0%19,604
2014588.668.2%18,716
2015521.460.2%19,106
2016533.660.9%18,853
201757.66.6%—
2018663.776.7%18,166
2019723.383.7%16,416
2020720.783.2%16,679
2021693.280.2%17,023
2022724.383.9%16,993
202369079.6%17,112
2024641.773.2%18,864
2025708.781.8%17,238

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Municipal Solid WasteST6249Mar 1990Operating—coming soon
GEN2Municipal Solid WasteST6249Mar 1990Operating—coming soon

Owner / operator

Operator: Covanta Fairfax Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Covanta Fairfax Inc100.0%124 MW

Nearby plants

Within 80 km.
Fairfax Landfill5 MW0.5 km
I 95 Landfill Phase II3 MW0.7 km
Covanta Alexandria/Arlington Energy29 MW15.3 km
MM Prince William Energyretired16.3 km
Possum Point709 MW17.9 km
Church Street Plant4 MW20.3 km