← Back to map

PPG Powerhouse C

Calcasieu County, Louisiana · EIA plant ID 50489 · Operator: Eagle 2 US LLC
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Steam TurbineMISOBA: MISO
Nameplate358MWSummer 303 MW
Generators5in service
Net generation1,525GWh12 mo to Aug 2026
Capacity factor57%gas/coal/oil units, summer MW
Heat rate4,310Btu/kWhfossil units, electric fuel, HHV
First online1977Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202557.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,000200520102015202020254,310 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012,393.5——
20022,356.9——
20032,172.681.8%12,915
20042,167.681.4%12,416
20051,95273.5%12,417
20061,659.262.5%12,304
20071,945.773.3%12,245
20081,983.674.5%12,416
20091,820.568.5%12,428
20102,027.176.3%12,368
20111,83969.2%12,527
20121,914.971.9%12,356
20132,236.477.6%10,751
20142,074.375.0%10,808
20151,843.369.4%10,056
20161,602.160.2%4,263
20171,772.466.7%4,287
20181,899.871.5%4,275
20192,132.280.3%4,295
20201,53857.8%4,303
20211,809.968.1%4,250
20221,708.464.3%4,289
20231,73565.3%4,285
20241,545.258.0%4,321
20251,547.958.3%4,300

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
C1Natural Gas Fired Combustion TurbineGT73.155Aug 1977Operating—coming soon
C2Natural Gas Fired Combustion TurbineGT73.155Jun 1978Operating—coming soon
C3Natural Gas Steam TurbineST57.152Sep 1977Operating—coming soon
C4Natural Gas Fired Combustion TurbineGT77.270.6Aug 1986Operating—coming soon
C5Natural Gas Fired Combustion TurbineGT77.270.6Aug 1986Operating—coming soon

Owner / operator

Operator: Eagle 2 US LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Eagle 2 US LLC100.0%358 MW

Nearby plants

Within 80 km.
PPG Plant C Caustic3 MW0.1 km
RS Cogen493 MW0.7 km
PPG Powerhouse A53 MW1.3 km
PPG Riverside162 MW1.5 km
Lake Charles Polymers31 MW4.2 km
CITGO Refinery Powerhouse75 MW5.5 km