Grafton County, New Hampshire · EIA plant ID 50208 · Operator: NE Renewable Bethlehem, LLC
OtherWood/Wood Waste BiomassISONEBA: ISNE
Nameplate18MWSummer 15 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%other units, summer MW
Heat rate—thermal plants only
First online1986

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001133.693.7%—
2002133.7101.8%—
2003139.5106.2%—
2004135102.5%—
2005129.898.8%—
2006129.398.4%—
2007130.499.2%—
2008119.490.6%—
2009130.599.3%—
2010132.3100.7%—
201194.872.2%—
2012130.899.3%—
2013124.594.7%—
2014127.997.3%—
2015100.376.3%—
2016111.284.4%—
2017121.492.4%—
201876.358.0%—
201980.361.1%—
202037.428.4%—
202100.0%—
202200.0%—
202300.0%—
202400.0%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST17.515Dec 1986Operating—coming soon

Owner / operator

Operator: NE Renewable Bethlehem, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NE Renewable Bethlehem, LLC100.0%18 MW

Nearby plants

Within 80 km.
Gilman Mill5 MW10 km
GSPP Gilman, LLC2 MW10.1 km
DG Whitefield LLC20 MW11.3 km
S C Moore195 MW15.5 km
Comerford168 MW25.5 km