Multitrade Rabun Gap, LLCRetired
RABUN County, Georgia · EIA plant ID 50201 · Operator: Multitrade Rabun Gap LLC
×18 MW other retired since 2020 (latest Apr 2025)
Nameplate—MWSummer — MW
Generators0in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 16.6 | 46.1% | — |
| 2002 | 19.2 | 53.4% | — |
| 2004 | 19.9 | 55.3% | — |
| 2005 | 16.9 | 47.0% | — |
| 2006 | 2.7 | 7.5% | — |
| 2009 | 0 | 0.0% | — |
| 2010 | 87.9 | 59.0% | — |
| 2011 | 107 | 71.9% | — |
| 2012 | 125.4 | 84.0% | — |
| 2013 | 121.9 | 81.9% | — |
| 2014 | 102.4 | 68.8% | — |
| 2015 | 102.5 | 73.1% | — |
| 2016 | 96.8 | 61.3% | — |
| 2017 | 116.9 | 74.1% | — |
| 2018 | 96.9 | 61.4% | — |
| 2019 | 117.8 | 74.7% | — |
| 2020 | 120.4 | 76.2% | — |
| 2021 | 116.7 | 74.0% | — |
| 2022 | 114.2 | 72.4% | — |
| 2023 | 123.9 | 78.6% | — |
| 2024 | 12.2 | 7.7% | — |
| 2025 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ST1 | Wood/Wood Waste Biomass | ST | 4.1 | 4.1 | Jan 1986 | Retired Jan 2010 | — | coming soon |
| ST2 | Wood/Wood Waste Biomass | ST | 17.9 | 18 | Jan 2010 | Retired Apr 2025 | — | coming soon |
Owner / operator
Operator: Multitrade Rabun Gap LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Terrora | 16 MW | 17.3 km |
| Nacoochee | 5 MW | 20.4 km |
| Burton Dam | 6 MW | 23.1 km |
| Tallulah Falls | 72 MW | 28.2 km |
| Tugalo | 45 MW | 28.3 km |
| Yonah | 23 MW | 28.4 km |