Texas City Plant Union Carbide

Galveston County, Texas · EIA plant ID 50153 · Operator: Union Carbide Corp-Texas City
OtherAll OtherERCOTBA: ERCO
Nameplate26MWSummer 26 MW
Generators1in service
Net generation123GWh12 mo to Aug 2026
Capacity factor55%other units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1996

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202554.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0007,0008,000200320042005200620072008200920102011
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001452——
2002415.3——
2003104—6,290
2004244.3——
2005167.832.9%8,364
2006187.432.1%8,364
2007186.121.4%8,196
2008246.930.1%8,364
2009258.829.6%8,364
2010155.736.1%8,364
201198.129.5%—
201297.829.3%—
201394.128.3%—
201476.923.1%—
201581.824.6%—
2016108.632.5%—
201781.424.4%—
201851.415.4%—
201970.321.1%—
202057.917.3%—
20216820.4%—
202258.617.6%—
202373.922.2%—
202450.115.0%—
202582.836.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STGAll OtherST25.825.8Mar 1996Operating—coming soon
GTGNatural Gas Fired Combustion TurbineGT4032Feb 1996Retired Oct 2014—coming soon

Owner / operator

Operator: Union Carbide Corp-Texas City. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Union Carbide Corp-Texas City100.0%26 MW

Nearby plants

Within 80 km.
Texas City Power Plant450 MW0.4 km
GCWA7 MW0.8 km
Green Power 2861 MW1.3 km
Zeya—1.4 km
Heights10 MW1.5 km
Power Station 4191 MW2.4 km