← Back to map

Folsom

Sacramento County, California · EIA plant ID 441 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricCAISOBA: BANC
Nameplate199MWSummer 215 MW
Generators3in service
Net generation560GWh12 mo to Aug 2026
Capacity factor30%hydro units, summer MW
Heat rate—thermal plants only
First online1955

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202529.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001302.816.1%—
200242922.8%—
2003581.730.9%—
2004457.224.2%—
2005755.840.1%—
2006894.147.4%—
2007371.419.7%—
200826013.8%—
2009474.325.2%—
201056730.1%—
2011762.640.5%—
2012465.824.7%—
2013341.918.1%—
2014185.19.8%—
2015203.510.8%—
201659431.4%—
2017861.645.7%—
2018583.431.0%—
2019774.341.1%—
2020360.719.1%—
2021155.68.3%—
2022415.622.1%—
2023895.147.5%—
2024604.332.0%—
2025503.426.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY66.271.7Jun 1955Operating—coming soon
2Conventional HydroelectricHY66.271.7Oct 1955Operating—coming soon
3Conventional HydroelectricHY66.271.7May 1955Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%199 MW

Nearby plants

Within 80 km.
Folsom SP and CSP Sacramento1 MW2.2 km
Intel Folsom Phase 35 MW6.8 km
Intel Folsom1 MW7 km
Intel Folsom Phase 21 MW7 km
Nimbus13 MW9.4 km
Blue Shld Of Cal- El Dorado Hlls Mtr B2 MW9.6 km