← Back to map

PHP 1

Multnomah County, Oregon · EIA plant ID 4213 · Operator: Portland City of
HydroConventional HydroelectricBA: PGE
Nameplate24MWSummer 24 MW
Generators1in service
Net generation38GWh12 mo to Dec 2025
Capacity factor18%hydro units, summer MW
Heat rate—thermal plants only
First online1982

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202517.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200173.534.9%—
200271.634.1%—
200386.641.2%—
200481.938.8%—
200564.630.7%—
200653.325.4%—
200700.0%—
200858.527.8%—
200949.623.6%—
201055.126.2%—
201153.625.5%—
201264.530.6%—
201352.525.0%—
201456.526.9%—
201538.318.2%—
201653.425.3%—
201755.226.3%—
201844.221.0%—
201931.114.8%—
202053.125.2%—
202137.918.0%—
202249.423.5%—
202340.219.1%—
202446.422.0%—
202537.617.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY23.724Feb 1982Operating—coming soon

Owner / operator

Operator: Portland City of. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Portland City of100.0%24 MW

Nearby plants

Within 80 km.
PHP 212 MW6.4 km
Brightwood Solar, LLC10 MW10.8 km
SulusSolar293 MW16.3 km
Boring Solar LLC2 MW16.7 km
NSE Astoria - Skyward3 MW16.7 km
Dunn Road Solar2 MW16.8 km