← Back to map

Elroy

Juneau County, Wisconsin · EIA plant ID 4113 · Operator: City of Elroy - (WI)
OilPetroleum LiquidsMISOBA: MISO
Nameplate7MWSummer 7 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate10,417Btu/kWhfossil units, electric fuel, HHV
First online1973Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%1%1%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,0002005201020152020202510,417 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.10.5%12,104
20020.10.4%9,259
20030.20.9%9,794
20040.10.5%10,303
20050.30.6%9,125
20060.20.3%12,227
20070.20.4%12,622
20080.10.2%10,651
20090.10.1%11,279
201000.1%12,394
201100.0%20,560
201200.1%10,769
201300.1%16,971
201400.0%11,050
201500.0%12,923
201600.1%6,824
201700.0%18,478
201800.1%7,273
20190.10.1%—
202000.1%9,758
20210.10.2%10,000
202200.0%10,400
202300.0%—
202400.0%—
202500.1%10,417

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1APetroleum LiquidsIC2.32.2Feb 2005Operating—coming soon
2APetroleum LiquidsIC2.32.2Feb 2005Operating—coming soon
5Petroleum LiquidsIC22.2May 1973Operating—coming soon
6Petroleum LiquidsIC2.22.1planned Dec 2004not_current—coming soon
7Petroleum LiquidsIC2.22.1planned Dec 2004not_current—coming soon

Owner / operator

Operator: City of Elroy - (WI). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Elroy - (WI)100.0%7 MW

Nearby plants

Within 80 km.
Webster Creek (Oak 2)2 MW16.4 km
Sauk DPC Solar1 MW16.6 km
New Lisbon8 MW17.6 km
New Lisbon Solar3 MW19.1 km
Elroy Solar2 MW19.5 km
Lemonweir (Oak 1)3 MW20.4 km