← Back to map

Scattergood

Los Angeles County, California · EIA plant ID 404 · Operator: Los Angeles Department of Water & Power
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbineNatural Gas Steam TurbineBA: LDWP
Nameplate876MWSummer 776 MW
Generators6in service
Net generation1,609GWh12 mo to Aug 2026
Capacity factor24%gas/coal/oil units, summer MW
Heat rate7,848Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202523.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,000200520102015202020257,848 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011,846.3——
20021,284.8——
20032,279.530.4%10,343
20041,741.422.7%10,910
20051,05613.3%11,158
20061,502.619.6%11,104
20071,243.315.6%11,000
20081,301.616.6%11,554
20091,01212.7%11,750
20101,014.313.0%11,392
2011890.411.0%12,223
20121,087.213.8%11,536
20131,199.115.6%11,752
20141,133.914.8%12,038
20151,278.117.5%11,986
20161,42019.3%8,672
20172,002.728.9%7,359
20181,786.826.1%7,522
20191,240.318.1%8,040
20201,701.724.7%8,008
20211,905.127.9%7,615
20221,888.127.7%7,600
20231,357.919.9%7,893
20241,055.515.4%8,383
20251,664.824.5%7,752

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Steam TurbineST163.2105Dec 1958Operating · retirement plannedDec 2029coming soon
2Natural Gas Steam TurbineST163.2156.3Jul 1959Operating · retirement plannedDec 2029coming soon
4Natural Gas Fired Combined CycleCT216.9206Oct 2015Operating—coming soon
5Natural Gas Fired Combined CycleCA118.9105Nov 2015Operating—coming soon
6Natural Gas Fired Combustion TurbineGT106.9102Aug 2015Operating—coming soon
7Natural Gas Fired Combustion TurbineGT106.9102Sep 2015Operating—coming soon
3Natural Gas Steam TurbineST496.8445Oct 1974Retired Dec 2015—coming soon

Owner / operator

Operator: Los Angeles Department of Water & Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Angeles Department of Water & Power100.0%876 MW

Nearby plants

Within 80 km.
Hyperion Treatment Plant CHP Plant33 MW0.8 km
El Segundo Energy Center LLC537 MW0.9 km
El Segundo Cogen180 MW2.6 km
Equinix Maple Ave. Fuel Cell2 MW3.2 km
Central Utilities Plant LAX 29 MW3.6 km
Equinix Douglas St. Fuel Cell2 MW4 km