← Back to map

Buck Hydro

Carroll County, Virginia · EIA plant ID 3772 · Operator: Appalachian Power Co
HydroConventional HydroelectricPJMBA: PJM
Nameplate8MWSummer 9 MW
Generators3in service
Net generation20GWh12 mo to Dec 2025
Capacity factor25%hydro units, summer MW
Heat rate—thermal plants only
First online1912

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%2005201020152020202524.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200127.836.9%—
20023039.9%—
200348.764.7%—
200445.954.9%—
200544.5169.3%—
200637.6143.1%—
200729.8113.4%—
200826.4100.3%—
200940.3153.4%—
20101620.2%—
201137.147.0%—
201237.647.5%—
201314.718.7%—
20143.64.6%—
201537.547.5%—
20163746.8%—
201736.746.6%—
201837.447.4%—
20193341.9%—
202054.468.8%—
202138.849.2%—
202237.147.0%—
202338.548.8%—
202425.632.3%—
202519.624.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY2.83Jan 1912Operating—coming soon
2Conventional HydroelectricHY2.83Jan 1912Operating—coming soon
3Conventional HydroelectricHY2.83Jan 1912Operating—coming soon

Owner / operator

Operator: Appalachian Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Appalachian Power Co100.0%8 MW

Nearby plants

Within 80 km.
Byllesby 222 MW2.5 km
Fries Hydroelectric Project5 MW11.2 km
Wythe County Solar75 MW11.8 km
River Trail Solar, LLC20 MW12 km
Caden Energix Wytheville LLC20 MW20 km
Hecate Energy Pulaski 1—43.1 km