← Back to map

Uintah

Duchesne County, Utah · EIA plant ID 3704 · Operator: Moon Lake Electric Assn Inc
HydroConventional HydroelectricBA: WACM
Nameplate1MWSummer 1 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor43%hydro units, summer MW
Heat rate—thermal plants only
First online1920

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202542.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012.730.4%—
20024.753.2%—
20036.574.7%—
20046.877.2%—
20057.873.9%—
20067.168.0%—
20076.864.8%—
20086.158.1%—
2009547.1%—
20106.258.8%—
20116.561.4%—
20126.460.5%—
20135.451.4%—
20146.662.7%—
20156.359.7%—
20166.561.4%—
20177.268.3%—
20186.461.2%—
20195.956.2%—
20205.955.9%—
20215.855.5%—
20225.552.6%—
20236.359.7%—
20246.763.6%—
20254.542.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY0.60.6Jul 1920Operating—coming soon
2Conventional HydroelectricHY0.60.6Sep 1940Operating—coming soon

Owner / operator

Operator: Moon Lake Electric Assn Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Moon Lake Electric Assn Inc100.0%1 MW

Nearby plants

Within 80 km.
Flaming Gorge152 MW68.6 km