← Back to map

Pioneer

Weber County, Utah · EIA plant ID 3656 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACE
Nameplate5MWSummer 4 MW
Generators2in service
Net generation11GWh12 mo to Dec 2025
Capacity factor30%hydro units, summer MW
Heat rate—thermal plants only
First online1910

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202530.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200110.128.9%—
20021028.5%—
20037.220.6%—
200410.229.1%—
200533.595.7%—
20062777.0%—
200712.335.0%—
200814.741.9%—
200924.770.5%—
201015.544.2%—
201128.681.7%—
201215.143.0%—
20137.722.0%—
2014925.7%—
20159.828.1%—
201611.432.4%—
201727.177.4%—
20189.226.4%—
201921.460.9%—
202017.349.2%—
20216.518.5%—
20227.621.8%—
202318.753.4%—
202418.352.0%—
202510.530.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY2.52Jun 1910Operating—coming soon
2Conventional HydroelectricHY2.52Jun 1910Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%5 MW

Nearby plants

Within 80 km.
SF Auto O13 MW6.3 km
Pine View Dam2 MW8.3 km
Hill AFB LFG Facility, Bldg #737retired12.8 km
Weber4 MW12.9 km
Gateway4 MW15.3 km
Weber State University - Davis Campus PV1 MW16.4 km