H 5Out of service
Gonzales County, Texas · EIA plant ID 3584 · Operator: Guadalupe Blanco River Authority
Nameplate2MWSummer 2 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online1931
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 8.5 | 40.5% | — |
| 2002 | 10 | 47.7% | — |
| 2003 | 11.2 | 53.4% | — |
| 2004 | 11.4 | 54.1% | — |
| 2005 | 11.6 | 55.0% | — |
| 2006 | 5.3 | 25.4% | — |
| 2007 | 11 | 52.5% | — |
| 2008 | 7.4 | 35.2% | — |
| 2009 | 4.5 | 21.3% | — |
| 2010 | 11 | 52.5% | — |
| 2011 | 4.2 | 19.8% | — |
| 2012 | 0 | 0.0% | — |
| 2013 | 3.6 | 17.3% | — |
| 2014 | 2.3 | 10.9% | — |
| 2015 | 7.8 | 37.3% | — |
| 2016 | 2 | 9.4% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0 | 0.0% | — |
| 2019 | 0 | 0.0% | — |
| 2020 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 2.4 | 2.4 | Jan 1931 | Operating (Out of service) | — | coming soon |
Owner / operator
Operator: Guadalupe Blanco River Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Guadalupe Blanco River Authority | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| H 4 | 2 MW | 13.2 km |
| GVEC | 2 MW | 26.9 km |
| CF BESS NINE | — | 30.4 km |
| Nolte | 2 MW | 43.3 km |
| Rio Nogales Power Project | 1,108 MW | 48.6 km |
| Niagara Bottling - Seguin | 5 MW | 48.8 km |