Lone StarRetired

Morris County, Texas · EIA plant ID 3477 · Operator: Southwestern Electric Power Co
Natural gasSPPBA: SWPP

×40 MW natural gas retired since 2020 (latest May 2020)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh2001200320052007200920112013201520172019

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200115.13.4%12,858
20028.62.0%13,169
200300.0%—
20040.20.0%14,071
200519.64.5%13,229
2006214.8%13,193
20077.31.7%13,769
20081.50.3%24,134
20091.70.4%14,481
201017.13.9%14,711
201145.110.3%13,639
201223.75.4%14,932
201320.5%15,725
20141.60.4%14,806
20155.51.3%12,104
20168.51.9%14,968
20171.10.3%14,501
20185.91.4%16,106
201911.52.6%15,164
202000.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Steam TurbineST4050Mar 1954Retired May 2020—coming soon

Owner / operator

Operator: Southwestern Electric Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Hecate Energy Upshur Rural LLC3 MW8.7 km
Wilkes882 MW18.2 km
Welsh1,116 MW18.5 km
Naples Power Plant—33.2 km
Snider Industries5 MW50.5 km
Eastman Cogeneration Facility468 MW52.7 km