Newman
El Paso County, Texas · EIA plant ID 3456 · Operator: El Paso Electric Co
Nameplate1,110MWSummer 906 MW
Generators10in service
Net generation3,417GWh12 mo to Aug 2026
Capacity factor43%gas/coal/oil units, summer MW
Heat rate9,972Btu/kWhfossil units, electric fuel, HHV
First online1960Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 2,043.9 | — | — |
| 2002 | 1,574.8 | — | — |
| 2003 | 1,629.8 | 37.4% | 11,038 |
| 2004 | 1,744.6 | 39.9% | 11,058 |
| 2005 | 1,937 | 44.4% | 10,837 |
| 2006 | 1,662 | 40.0% | 11,019 |
| 2007 | 2,106.7 | 50.7% | 10,412 |
| 2008 | 1,924 | 45.7% | 10,667 |
| 2009 | 1,897.3 | 38.6% | 10,727 |
| 2010 | 2,145.7 | 39.6% | 10,589 |
| 2011 | 2,586.7 | 39.4% | 9,959 |
| 2012 | 2,761.6 | 41.3% | 10,063 |
| 2013 | 2,920.8 | 43.8% | 9,309 |
| 2014 | 2,761.3 | 41.4% | 9,484 |
| 2015 | 2,625.9 | 39.4% | 9,883 |
| 2016 | 1,904.7 | 28.5% | 11,318 |
| 2017 | 1,943.6 | 29.2% | 10,881 |
| 2018 | 3,192.5 | 48.5% | 9,839 |
| 2019 | 3,162.9 | 49.1% | 9,730 |
| 2020 | 3,011.8 | 46.6% | 9,627 |
| 2021 | 2,982 | 46.3% | 9,880 |
| 2022 | 3,047.4 | 49.5% | 10,497 |
| 2023 | 3,187.4 | 50.4% | 9,939 |
| 2024 | 3,598.3 | 44.0% | 10,012 |
| 2025 | 4,003.5 | 50.4% | 9,980 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operating—
Net summer MW on gas—
Net summer MW on oil—
Time gas → oilup to 6 h (EIA 6H)
Time oil → gasup to 6 h (EIA 6H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | ST | 81.6 | 61 | May 1960 | Operating · retirement planned | Dec 2027 | coming soon |
| 2 | Natural Gas Steam Turbine | ST | 81.6 | 65 | Jun 1963 | Operating · retirement planned | Dec 2028 | coming soon |
| 3 | Natural Gas Steam Turbine | ST | 121.8 | 88 | Mar 1966 | Operating · retirement planned | Dec 2031 | coming soon |
| 4 | Natural Gas Fired Combined Cycle | CA | 120 | 86 | Aug 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| 5CA1 | Natural Gas Fired Combined Cycle | CA | 134 | 115 | Feb 2011 | Operating | — | coming soon |
| 5CT1 | Natural Gas Fired Combined Cycle | CT | 86.5 | 66 | Jun 2009 | Operating | — | coming soon |
| 5CT2 | Natural Gas Fired Combined Cycle | CT | 86.5 | 66 | Jun 2009 | Operating | — | coming soon |
| 6 | Natural Gas Fired Combustion Turbine | GT | 227.8 | 227.8 | Dec 2023 | Operating | — | coming soon |
| CT1 | Natural Gas Fired Combined Cycle | CT | 85 | 64 | Aug 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| CT2 | Natural Gas Fired Combined Cycle | CT | 85 | 67 | Aug 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 335 | 288 | planned Feb 2011 | not_current | — | coming soon |
Owner / operator
Operator: El Paso Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| El Paso Electric Co | 100.0% | 1,110 MW |
Nearby plants
Within 80 km.
| Newman Solar | 11 MW | 0.7 km |
| Newman Buffer | — | 0.9 km |
| SunE EPE1 LLC | 10 MW | 10.3 km |
| Buena Vista Energy Center III | — | 16.6 km |
| Buena Vista Energy Center | 170 MW | 16.6 km |
| Fort Bliss (DEA EPIC) | 2 MW | 18 km |