Eagle Pass
Maverick County, Texas · EIA plant ID 3437 · Operator: Maverick Cty Water Control & Improvement
Nameplate10MWSummer 6 MW
Generators3in service
Net generation2GWh12 mo to Aug 2026
Capacity factor4%hydro units, summer MW
Heat rate—thermal plants only
First online1932
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 46.9 | 89.3% | — |
| 2002 | 42.5 | 80.9% | — |
| 2003 | 33.4 | 63.4% | — |
| 2004 | 31.9 | 60.5% | — |
| 2005 | 44.1 | 83.9% | — |
| 2006 | 50.5 | 96.0% | — |
| 2007 | 50.9 | 96.8% | — |
| 2008 | 50.3 | 95.4% | — |
| 2009 | 45.3 | 86.2% | — |
| 2010 | 43.2 | 82.2% | — |
| 2011 | 39.9 | 75.9% | — |
| 2012 | 35.6 | 67.6% | — |
| 2013 | 31.4 | 59.8% | — |
| 2014 | 33.4 | 63.5% | — |
| 2015 | 38.1 | 72.5% | — |
| 2016 | 31.9 | 60.5% | — |
| 2017 | 32.8 | 62.3% | — |
| 2018 | 33.1 | 62.9% | — |
| 2019 | 40 | 76.1% | — |
| 2020 | 31.3 | 59.4% | — |
| 2021 | 36.8 | 70.0% | — |
| 2022 | 44.2 | 84.0% | — |
| 2023 | 43 | 81.8% | — |
| 2024 | 36.1 | 68.5% | — |
| 2025 | 16.9 | 32.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 3.2 | 2 | Aug 1932 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 3.2 | 2 | Aug 1932 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 3.2 | 2 | Aug 1932 | Operating | — | coming soon |
Owner / operator
Operator: Maverick Cty Water Control & Improvement. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Maverick Cty Water Control & Improvement | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Serrano BESS | — | 1 km |
| Regis Escondido | 10 MW | 13.3 km |
| WAL461 | 1 MW | 15.7 km |
| Pueblo BA | 20 MW | 18.8 km |
| Fort Duncan BESS | 103 MW | 20.5 km |
| OCI Alamo 4, LLC | 40 MW | 54.8 km |