Gallatin (TN)Retirement planned
Sumner County, Tennessee · EIA plant ID 3403 · Operator: Tennessee Valley Authority
Nameplate1,918MWSummer 1,556 MW
Generators12in service
Net generation5,013GWh12 mo to Aug 2026
Capacity factor40%gas/coal/oil units, summer MW
Heat rate11,393Btu/kWhfossil units, electric fuel, HHV
First online1956Runs as intermediate
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 7,198.9 | — | — |
| 2002 | 7,271.8 | — | — |
| 2003 | 7,638.9 | 55.5% | 9,875 |
| 2004 | 7,175 | 51.9% | 9,839 |
| 2005 | 7,562 | 54.8% | 9,850 |
| 2006 | 7,609.8 | 55.6% | 9,973 |
| 2007 | 7,450.9 | 54.5% | 10,019 |
| 2008 | 7,921 | 57.3% | 10,038 |
| 2009 | 6,484 | 47.0% | 10,380 |
| 2010 | 6,841.9 | 49.6% | 10,325 |
| 2011 | 7,375 | 53.4% | 10,204 |
| 2012 | 6,581 | 48.2% | 10,253 |
| 2013 | 6,616 | 48.5% | 10,209 |
| 2014 | 5,912.3 | 43.4% | 10,303 |
| 2015 | 3,932.5 | 28.9% | 10,801 |
| 2016 | 5,667.3 | 41.5% | 10,759 |
| 2017 | 5,326.1 | 39.1% | 10,776 |
| 2018 | 5,189.5 | 38.1% | 11,003 |
| 2019 | 4,157.9 | 30.5% | 11,200 |
| 2020 | 2,429.3 | 17.8% | 11,639 |
| 2021 | 4,034.8 | 29.6% | 10,925 |
| 2022 | 4,450.5 | 32.7% | 11,124 |
| 2023 | 3,750.3 | 27.5% | 11,328 |
| 2024 | 4,158.2 | 30.4% | 11,049 |
| 2025 | 4,324.1 | 31.7% | 10,690 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo146,464 MMBtu
Last month with liquid burnMay 2026
Switch while operatingYes
Net summer MW on gas580
Net summer MW on oil584
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Steam Coal | ST | 300 | 225 | Nov 1956 | Operating · retirement planned | Dec 2031 | coming soon |
| 2 | Conventional Steam Coal | ST | 300 | 225 | Jun 1957 | Operating · retirement planned | Dec 2031 | coming soon |
| 3 | Conventional Steam Coal | ST | 327.6 | 263 | May 1959 | Operating · retirement planned | Dec 2031 | coming soon |
| 4 | Conventional Steam Coal | ST | 327.6 | 263 | Aug 1959 | Operating · retirement planned | Dec 2031 | coming soon |
| GT1 | Natural Gas Fired Combustion Turbine | GT | 81.3 | 71.5 | Jul 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| GT2 | Natural Gas Fired Combustion Turbine | GT | 81.3 | 71.5 | Jul 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| GT3 | Natural Gas Fired Combustion Turbine | GT | 81.3 | 71.5 | Jul 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 81.3 | 71.5 | Jul 1975 | Operating · retirement planned | Dec 2031 | coming soon |
| GT5 | Natural Gas Fired Combustion Turbine | GT | 84.5 | 73.4 | Jul 2000 | Operating · retirement planned | Dec 2031 | coming soon |
| GT6 | Natural Gas Fired Combustion Turbine | GT | 84.5 | 73.4 | Jul 2000 | Operating · retirement planned | Dec 2031 | coming soon |
| GT7 | Natural Gas Fired Combustion Turbine | GT | 84.5 | 73.4 | Jul 2000 | Operating · retirement planned | Dec 2031 | coming soon |
| GT8 | Natural Gas Fired Combustion Turbine | GT | 84.5 | 73.4 | Jul 2000 | Operating · retirement planned | Dec 2031 | coming soon |
Owner / operator
Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Tennessee Valley Authority | 100.0% | 1,918 MW |
Nearby plants
Within 80 km.
| Old Hickory | 104 MW | 22.9 km |
| J P Priest | 28 MW | 26.4 km |
| Opryland USA | 5 MW | 28.8 km |
| Music City Community Solar | 2 MW | 31.9 km |
| SR Horus | — | 40.2 km |
| Vanderbilt University Power Plant | 19 MW | 40.8 km |