Apalachia

Polk County, Tennessee · EIA plant ID 3394 · Operator: Tennessee Valley Authority
HydroConventional HydroelectricBA: TVA
Nameplate94MWSummer 82 MW
Generators2in service
Net generation389GWh12 mo to Dec 2025
Capacity factor54%hydro units, summer MW
Heat rate—thermal plants only
First online1943

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202553.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001295.845.6%—
2002383.158.0%—
200357587.1%—
2004381.455.4%—
2005482.169.0%—
2006336.747.1%—
2007217.930.2%—
2008204.628.3%—
2009429.759.5%—
2010398.755.2%—
2011302.441.9%—
2012326.145.1%—
2013551.276.4%—
2014415.757.6%—
2015310.543.0%—
2016177.924.6%—
2017310.843.1%—
2018457.763.4%—
201949368.3%—
2020715.398.8%—
2021596.882.7%—
2022426.259.0%—
2023435.960.4%—
2024402.155.5%—
2025389.153.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY52.241.2Nov 1943Operating—coming soon
2Conventional HydroelectricHY41.441.2Sep 1943Operating—coming soon

Owner / operator

Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tennessee Valley Authority100.0%94 MW

Nearby plants

Within 80 km.
Hiwassee Dam166 MW10.9 km
Ocoee 329 MW19.9 km
Ocoee 223 MW20.2 km
Murphy Farm Power, LLC1 MW22.6 km
CS Murphy Point, LLC1 MW23 km
Nottely16 MW29.9 km