Parr GT

Fairfield County, South Carolina · EIA plant ID 3291 · Operator: South Carolina Electric&Gas Company
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: SCEG

×84 MW natural gas retired since 2020 (latest Mar 2023)

Nameplate131MWSummer 84 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2025Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh200120032005200720092011201320152017201920212023

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,00020,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20018.71.4%16,838
20024.70.8%16,146
20031.50.2%15,352
20041.20.2%17,539
20051.80.3%18,450
20062.90.5%17,604
200711.41.9%16,377
20082.70.4%16,614
20092.70.4%15,797
20108.71.4%15,882
20116.11.0%15,267
201212.22.0%16,153
20133.60.6%15,463
20145.30.9%13,684
20152.30.4%14,207
20167.31.4%17,271
20173.30.6%16,137
20187.31.4%15,869
20192.40.4%17,757
20205.31.0%16,219
20212.60.5%16,498
20223.80.7%15,606
20230.20.2%4,784
20240——
202500.0%—

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo381 MMBtu
Last month with liquid burnMar 2023
Switch while operating—
Net summer MW on gas—
Net summer MW on oil—
Time gas → oil—
Time oil → gas—

⚠ EIA-860 vs 923: 923 shows liquid fuel burn in gas turbines but 860 lists no oil capability.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT5Natural Gas Fired Combustion TurbineGT65.442Dec 2025Operating—coming soon
GT6Natural Gas Fired Combustion TurbineGT65.442Dec 2025Operating—coming soon
GT1Natural Gas Fired Combustion TurbineGT19.613.5Jul 1970Retired Mar 2023—coming soon
GT2Natural Gas Fired Combustion TurbineGT19.613.5Jul 1970Retired Mar 2023—coming soon
GT3Natural Gas Fired Combustion TurbineGT22.316.5Jun 1971Retired Mar 2023—coming soon
GT4Natural Gas Fired Combustion TurbineGT22.316.5Jun 1971Retired Mar 2023—coming soon

Owner / operator

Operator: South Carolina Electric&Gas Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
South Carolina Electric&Gas Company100.0%131 MW

Nearby plants

Within 80 km.
Parr Hydro15 MW0.3 km
V C Summer1,030 MW4.1 km
Fairfield Pumped Storage587 MW4.7 km
Midway Green Solar13 MW18.3 km
McMeekin294 MW25.4 km
Saluda Lexington207 MW25.7 km