← Back to map

Hagood

Charleston County, South Carolina · EIA plant ID 3285 · Operator: South Carolina Electric&Gas Company
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: SCEG
Nameplate177MWSummer 126 MW
Generators3in service
Net generation33GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate14,398Btu/kWhfossil units, electric fuel, HHV
First online1991Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%200520102015202020253.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00012,00014,0002005201020152020202514,398 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200129.94.0%12,936
200239.45.2%13,390
200331.44.2%12,893
2004202.6%13,432
200512.21.6%13,297
200619.72.6%14,265
2007314.1%14,171
200821.12.8%14,362
200919.22.5%13,668
201051.74.8%12,539
201155.65.0%12,278
201265.25.9%12,488
201333.33.0%12,702
201428.72.6%12,345
2015262.4%11,909
201628.32.6%11,543
201732.12.9%11,339
201823.72.1%11,989
201913.21.2%12,867
202025.62.3%12,911
202129.82.7%12,992
202229.42.7%13,004
202323.32.1%13,959
202417.91.6%14,957
2025333.0%14,398

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo120,303 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas126
Net summer MW on oil126
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4Natural Gas Fired Combustion TurbineGT12288Jun 1991Operating—coming soon
5Natural Gas Fired Combustion TurbineGT27.418Dec 2009Operating—coming soon
6Natural Gas Fired Combustion TurbineGT27.920Feb 2010Operating—coming soon

Owner / operator

Operator: South Carolina Electric&Gas Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
South Carolina Electric&Gas Company100.0%177 MW

Nearby plants

Within 80 km.
Kapstoneretired8.2 km
Bushy Park Combustion Turbine Facility65 MW21.2 km
Williams660 MW21.3 km
Berkeley County Landfill3 MW33.3 km
Omtanke Solar6 MW43.6 km
Jefferies145 MW46.5 km