Darlington County
Darlington County, South Carolina · EIA plant ID 3250 · Operator: Duke Energy Progress - (NC)
×529 MW natural gas retired since 2020 (latest Mar 2020)
Nameplate316MWSummer 230 MW
Generators2in service
Net generation56GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate12,362Btu/kWhfossil units, electric fuel, HHV
First online1997Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 103.8 | 1.5% | 17,689 |
| 2002 | 80.7 | 1.1% | 16,655 |
| 2003 | 27.9 | 0.4% | 12,117 |
| 2004 | 11.3 | 0.2% | 24,728 |
| 2005 | 62.9 | 0.9% | 17,514 |
| 2006 | 62.6 | 0.9% | 17,670 |
| 2007 | 148 | 2.1% | 16,131 |
| 2008 | 90.8 | 1.3% | 16,018 |
| 2009 | 54.9 | 0.8% | 16,336 |
| 2010 | 136.7 | 1.9% | 15,246 |
| 2011 | 120.1 | 1.7% | 14,722 |
| 2012 | 90.1 | 1.3% | 15,078 |
| 2013 | 61 | 0.9% | 15,266 |
| 2014 | 111.1 | 1.6% | 14,059 |
| 2015 | 110.8 | 1.6% | 14,322 |
| 2016 | 114.4 | 1.8% | 13,518 |
| 2017 | 77.1 | 1.3% | 14,711 |
| 2018 | 230.8 | 4.2% | 13,028 |
| 2019 | 21.1 | 0.4% | 15,953 |
| 2020 | 1.4 | 0.1% | — |
| 2021 | 3.9 | 0.2% | 19,450 |
| 2022 | 95.1 | 4.7% | 12,407 |
| 2023 | 22.1 | 1.1% | 13,613 |
| 2024 | 17 | 0.8% | 13,465 |
| 2025 | 56.2 | 2.8% | 12,362 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo347,152 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas234
Net summer MW on oil234
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 12 | Natural Gas Fired Combustion Turbine | GT | 158 | 115 | May 1997 | Operating | — | coming soon |
| 13 | Natural Gas Fired Combustion Turbine | GT | 158 | 115 | Jun 1997 | Operating | — | coming soon |
| 1 | Natural Gas Fired Combustion Turbine | GT | 66.8 | 50 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 10 | Petroleum Liquids | GT | 65.8 | 49 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 11 | Petroleum Liquids | GT | 66.8 | 52 | Sep 1974 | Retired Nov 2015 | — | coming soon |
| 2 | Petroleum Liquids | GT | 65.8 | 48 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 3 | Natural Gas Fired Combustion Turbine | GT | 66.8 | 50 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 4 | Petroleum Liquids | GT | 65.8 | 48 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 66.8 | 51 | Mar 1975 | Retired May 2018 | — | coming soon |
| 6 | Petroleum Liquids | GT | 65.8 | 43 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 7 | Natural Gas Fired Combustion Turbine | GT | 66.8 | 47 | Jun 1975 | Retired Mar 2020 | — | coming soon |
| 8 | Petroleum Liquids | GT | 65.8 | 44 | Aug 1974 | Retired Mar 2020 | — | coming soon |
| 9 | Petroleum Liquids | GT | 66.8 | 50 | Sep 1974 | Retired Jun 2017 | — | coming soon |
Owner / operator
Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Progress - (NC) | 100.0% | 316 MW |
Nearby plants
Within 80 km.
| H B Robinson | 769 MW | 2 km |
| Robinson Solar Plant | — | 2.4 km |
| Stamey Solar | 2 MW | 5.1 km |
| Lotus Solar | — | 6.6 km |
| B & K Solar | — | 9.5 km |
| Sonoco Products Co | 41 MW | 9.7 km |