← Back to map

Darlington County

Darlington County, South Carolina · EIA plant ID 3250 · Operator: Duke Energy Progress - (NC)
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: CPLE

×529 MW natural gas retired since 2020 (latest Mar 2020)

Nameplate316MWSummer 230 MW
Generators2in service
Net generation56GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate12,362Btu/kWhfossil units, electric fuel, HHV
First online1997Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-200204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%200520102015202020252.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002005201020152020202512,362 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001103.81.5%17,689
200280.71.1%16,655
200327.90.4%12,117
200411.30.2%24,728
200562.90.9%17,514
200662.60.9%17,670
20071482.1%16,131
200890.81.3%16,018
200954.90.8%16,336
2010136.71.9%15,246
2011120.11.7%14,722
201290.11.3%15,078
2013610.9%15,266
2014111.11.6%14,059
2015110.81.6%14,322
2016114.41.8%13,518
201777.11.3%14,711
2018230.84.2%13,028
201921.10.4%15,953
20201.40.1%—
20213.90.2%19,450
202295.14.7%12,407
202322.11.1%13,613
2024170.8%13,465
202556.22.8%12,362

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo347,152 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas234
Net summer MW on oil234
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
12Natural Gas Fired Combustion TurbineGT158115May 1997Operating—coming soon
13Natural Gas Fired Combustion TurbineGT158115Jun 1997Operating—coming soon
1Natural Gas Fired Combustion TurbineGT66.850Aug 1974Retired Mar 2020—coming soon
10Petroleum LiquidsGT65.849Aug 1974Retired Mar 2020—coming soon
11Petroleum LiquidsGT66.852Sep 1974Retired Nov 2015—coming soon
2Petroleum LiquidsGT65.848Aug 1974Retired Mar 2020—coming soon
3Natural Gas Fired Combustion TurbineGT66.850Aug 1974Retired Mar 2020—coming soon
4Petroleum LiquidsGT65.848Aug 1974Retired Mar 2020—coming soon
5Natural Gas Fired Combustion TurbineGT66.851Mar 1975Retired May 2018—coming soon
6Petroleum LiquidsGT65.843Aug 1974Retired Mar 2020—coming soon
7Natural Gas Fired Combustion TurbineGT66.847Jun 1975Retired Mar 2020—coming soon
8Petroleum LiquidsGT65.844Aug 1974Retired Mar 2020—coming soon
9Petroleum LiquidsGT66.850Sep 1974Retired Jun 2017—coming soon

Owner / operator

Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Progress - (NC)100.0%316 MW

Nearby plants

Within 80 km.
H B Robinson769 MW2 km
Robinson Solar Plant—2.4 km
Stamey Solar2 MW5.1 km
Lotus Solar—6.6 km
B & K Solar—9.5 km
Sonoco Products Co41 MW9.7 km