← Back to map

Moser Generating Station

Montgomery County, Pennsylvania · EIA plant ID 3163 · Operator: Exelon Power
OilPetroleum LiquidsPJMBA: PJM
Nameplate64MWSummer 51 MW
Generators3in service
Net generation1GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate14,969Btu/kWhfossil units, electric fuel, HHV
First online1970Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%200520102015202020250.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,0002005201020152020202514,969 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013.30.7%14,310
20027.41.7%14,100
20030.90.2%14,021
20040.40.1%14,106
20055.91.3%11,146
200620.4%14,032
20071.40.3%13,961
200810.2%13,890
20090.40.1%13,939
20102.10.5%14,716
20118.11.8%13,610
20121.70.4%15,481
20132.30.5%14,245
20146.91.6%13,585
201551.1%13,410
20163.70.8%15,739
201710.2%20,290
20182.40.5%14,102
20190.60.1%22,186
20200.10.0%28,118
20212.70.6%14,728
20222.60.6%13,955
20230.30.1%16,959
20240.20.0%16,909
20251.50.3%14,969

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT21.217Jun 1970Operating—coming soon
2Petroleum LiquidsGT21.217May 1970Operating—coming soon
3Petroleum LiquidsGT21.217Jun 1970Operating—coming soon

Owner / operator

Operator: Exelon Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Exelon Power100.0%64 MW

Nearby plants

Within 80 km.
Limerick2,277 MW3 km
Birdsboro Power525 MW15.7 km
Pickering Solar2 MW16.9 km
Pioneer Crossing Energy, LLC8 MW17.3 km
Morgantown Solar Park2 MW22.9 km
Titus36 MW25.7 km