← Back to map

Tolna

York County, Pennsylvania · EIA plant ID 3116 · Operator: Tolna Power, LLC
OilPetroleum LiquidsPJMBA: PJM
Nameplate54MWSummer 41 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate20,519Btu/kWhfossil units, electric fuel, HHV
First online1972Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-101234GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%3%200520102015202020250.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,50015,00017,50020,00022,5002005201020152020202520,519 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012.70.8%15,566
20029.52.7%15,559
200310.12.9%14,999
20045.31.5%15,272
200510.63.0%15,159
20063.10.9%15,202
20076.51.8%15,206
20081.50.4%20,613
20090.10.0%—
20102.30.7%19,065
20111.50.4%21,991
20120.50.2%—
20130.30.1%—
20143.51.1%16,782
2015-0-0.0%—
2016-0.1-0.0%—
20170.10.0%—
20180.80.3%18,747
20191.70.5%17,125
20202.20.7%16,329
20212.90.8%16,966
20224.31.2%15,618
20230.20.1%—
20240.30.1%—
20252.30.7%20,519

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT2721Jun 1972Operating—coming soon
2Petroleum LiquidsGT2720.2Jun 1972Operating—coming soon

Owner / operator

Operator: Tolna Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tolna Power, LLC100.0%54 MW

Nearby plants

Within 80 km.
New Freedom Solar Partners—5.5 km
Parkton Landfill5 MW11 km
FFP - MD Foxhall2 MW12.3 km
Cottontail Solar 820 MW22.3 km
Cottontail Solar 120 MW22.4 km
Cottontail Solar 220 MW22.8 km