Lookout Point
Lane County, Oregon · EIA plant ID 3083 · Operator: USACE Northwestern Division
Nameplate120MWSummer 120 MW
Generators3in service
Net generation227GWh12 mo to Dec 2025
Capacity factor22%hydro units, summer MW
Heat rate—thermal plants only
First online1955
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 214.2 | 17.7% | — |
| 2002 | 258.5 | 21.4% | — |
| 2003 | 263.5 | 21.8% | — |
| 2004 | 255.8 | 24.3% | — |
| 2005 | 230.7 | 21.9% | — |
| 2006 | 386.5 | 36.8% | — |
| 2007 | 302.9 | 28.8% | — |
| 2008 | 302.9 | 28.7% | — |
| 2009 | 316.5 | 30.1% | — |
| 2010 | 268.9 | 25.6% | — |
| 2011 | 327.4 | 31.1% | — |
| 2012 | 305.4 | 29.0% | — |
| 2013 | 241.6 | 23.0% | — |
| 2014 | 346.6 | 33.0% | — |
| 2015 | 218.9 | 20.8% | — |
| 2016 | 335.9 | 31.9% | — |
| 2017 | 387.1 | 36.8% | — |
| 2018 | 240.1 | 22.8% | — |
| 2019 | 272.4 | 25.9% | — |
| 2020 | 225.7 | 21.4% | — |
| 2021 | 197.1 | 18.8% | — |
| 2022 | 203.2 | 19.3% | — |
| 2023 | 116.8 | 11.1% | — |
| 2024 | 175.1 | 16.6% | — |
| 2025 | 227 | 21.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 40 | 40 | May 1955 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 40 | 40 | Mar 1955 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 40 | 40 | Jan 1955 | Operating | — | coming soon |
Owner / operator
Operator: USACE Northwestern Division. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| USACE Northwestern Division | 100.0% | 120 MW |
Nearby plants
Within 80 km.
| Dexter | 15 MW | 4.3 km |
| Walterville | 8 MW | 18.4 km |
| Short Mountain | 3 MW | 20.2 km |
| Leaburg | retired | 21.3 km |
| Dorena Hydro-Electric Facility | 8 MW | 21.8 km |
| IP Springfield Oregon | 33 MW | 22.6 km |