Pensacola

Mayes County, Oklahoma · EIA plant ID 2981 · Operator: Grand River Dam Authority
HydroConventional HydroelectricSPPBA: SWPP
Nameplate130MWSummer 121 MW
Generators7in service
Net generation422GWh12 mo to Dec 2025
Capacity factor40%hydro units, summer MW
Heat rate—thermal plants only
First online1940

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202539.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001318.132.8%—
2002266.926.6%—
2003250.524.2%—
2004556.152.5%—
2005496.547.0%—
20061039.8%—
2007535.650.7%—
2008736.969.6%—
2009691.265.5%—
2010526.549.9%—
2011321.430.4%—
2012188.417.8%—
2013458.141.3%—
2014214.119.3%—
2015525.147.4%—
2016475.342.8%—
201737133.5%—
2018341.130.8%—
2019829.474.8%—
2020511.452.6%—
2021516.653.3%—
2022388.939.0%—
202322822.9%—
2024349.134.5%—
2025422.239.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY21.620.1Aug 1940Operating—coming soon
2Conventional HydroelectricHY21.620Aug 1940Operating—coming soon
3Conventional HydroelectricHY21.620.1Aug 1940Operating—coming soon
4Conventional HydroelectricHY21.620Aug 1940Operating—coming soon
5Conventional HydroelectricHY21.620.1Aug 1946Operating—coming soon
6Conventional HydroelectricHY21.620Aug 1946Operating—coming soon
AConventional HydroelectricHY0.50.5Aug 1940Operating (Out of service)—coming soon

Owner / operator

Operator: Grand River Dam Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Grand River Dam Authority100.0%130 MW

Nearby plants

Within 80 km.
Twelvemile Solar 3—22.6 km
Saltbranch Solar 173 MW22.6 km
Twelvemile Solar 252 MW22.6 km
Twelvemile Solar 1152 MW22.6 km
Saltbranch 273 MW22.6 km
Salina259 MW23.2 km