← Back to map

Spring Gap

Tuolumne County, California · EIA plant ID 284 · Operator: Pacific Gas & Electric Co
HydroConventional HydroelectricCAISOBA: CISO
Nameplate6MWSummer 7 MW
Generators1in service
Net generation12GWh12 mo to Dec 2025
Capacity factor19%hydro units, summer MW
Heat rate—thermal plants only
First online1921

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2024GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202519.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013455.4%—
20023658.7%—
200342.669.5%—
200437.561.0%—
200544.272.0%—
200642.970.0%—
200724.139.3%—
200833.754.9%—
200938.662.9%—
201041.767.9%—
201140.766.4%—
201220.633.5%—
201330.649.9%—
201415.325.0%—
201525.141.0%—
201634.856.6%—
201729.748.4%—
20183048.9%—
201934.756.5%—
202020.232.8%—
202114.223.2%—
202233.554.6%—
202331.150.6%—
202425.942.2%—
202511.618.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY67Sep 1921Operating—coming soon

Owner / operator

Operator: Pacific Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pacific Gas & Electric Co100.0%6 MW

Nearby plants

Within 80 km.
Sand Bar Power Plant16 MW3.3 km
Beardsley10 MW3.5 km
Donnells72 MW9.5 km
Stanislaus82 MW23.2 km
Collierville Powerhouse253 MW24 km
Spicer Meadow Project6 MW24.8 km