← Back to map

FirstEnergy EastlakeRetired

Lake County, Ohio · EIA plant ID 2837 · Operator: FirstEnergy Generation Corp
CoalPJMBA: PJM

×32 MW oil retired since 2020 (latest Feb 2020)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600800GWh2001200320052007200920112013201520172019

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20015,022.2——
20026,743.4——
20036,221.356.5%9,882
20046,30257.1%10,238
20058,380.976.1%9,962
20068,76579.6%10,074
20077,151.365.0%11,302
20087,699.769.7%9,964
20095,399.649.0%10,251
20106,433.758.4%10,183
20116,682.360.7%10,367
20124,478.952.1%10,352
2013540.714.7%11,961
20141,184.232.2%11,279
2015601.756.5%10,615
20160.10.1%—
20170.10.0%20,173
20180.20.1%16,896
20190.10.1%18,194
202000.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional Steam CoalST123132Sep 1953Retired Apr 2015—coming soon
2Conventional Steam CoalST123132Dec 1953Retired Apr 2015—coming soon
3Conventional Steam CoalST123132Aug 1954Retired Apr 2015—coming soon
4Conventional Steam CoalST208240Mar 1956Retired Sep 2012—coming soon
5Conventional Steam CoalST680597Sep 1972Retired Sep 2012—coming soon
6Petroleum LiquidsGT3224Dec 1973Retired Feb 2020—coming soon

Owner / operator

Operator: FirstEnergy Generation Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Euclid Farm, Stamco N-541 MW8.9 km
LE Wind Turbine 13 MW11.9 km
Painesville56 MW16.8 km
Collinwood16 MW17.5 km
Cleveland Peaking11 MW17.6 km
Collinwood BioEnergy Facility1 MW17.7 km