Tuckasegee

Jackson County, North Carolina · EIA plant ID 2751 · Operator: Duke Energy Carolinas, LLC
HydroConventional HydroelectricBA: DUK
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor21%hydro units, summer MW
Heat rate—thermal plants only
First online1950

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.5GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202520.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014.517.0%—
20027.227.6%—
20038.632.7%—
20047.428.1%—
200510.238.8%—
20065.525.1%—
20073.717.0%—
20085.424.6%—
20098.136.8%—
20106.228.2%—
20116.328.8%—
2012627.3%—
2013732.0%—
20145.725.9%—
20154.621.1%—
20162.411.1%—
20174.219.1%—
20187.132.3%—
20198.337.9%—
2020522.9%—
20218.137.0%—
20225.625.8%—
20234.822.0%—
20244.219.0%—
20254.520.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY32.5May 1950Operating—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Carolinas, LLC100.0%3 MW

Nearby plants

Within 80 km.
Thorpe22 MW1.5 km
Cedar Cliff6 MW2.8 km
Bear Creek Dam9 MW5.1 km
Tennessee Creek11 MW12 km
Franklin (NC)1 MW22.3 km
Bad Creek1,680 MW29.2 km