← Back to map

Northport

Suffolk County, New York · EIA plant ID 2516 · Operator: National Grid Generation LLC
Natural gasNatural Gas Steam TurbinePetroleum LiquidsNYISOBA: NYIS
Nameplate1,564MWSummer 1,604 MW
Generators5in service
Net generation4,217GWh12 mo to Aug 2026
Capacity factor30%gas/coal/oil units, summer MW
Heat rate10,609Btu/kWhfossil units, electric fuel, HHV
First online1967Runs as intermediate

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600800GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202530.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00010,50011,0002005201020152020202510,609 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20017,269.5——
20027,284.1——
20037,507.155.2%10,235
20046,684.648.7%10,294
20057,423.754.2%10,115
20065,918.243.2%10,483
20075,51039.8%10,363
20084,492.932.1%10,621
20093,262.523.5%10,846
20104,029.529.3%10,815
20113,47024.9%10,761
20123,300.723.7%10,742
20133,194.222.9%10,611
20142,681.419.3%10,756
20153,053.321.9%10,595
20162,502.417.9%10,770
20171,627.511.7%10,932
20182,68419.2%10,790
20192,029.114.4%10,996
20202,952.621.0%10,712
20213,949.128.1%10,620
20222,90020.6%10,770
20232,390.217.0%10,990
20243,705.126.3%10,792
20254,088.629.1%10,592

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2Natural Gas Steam TurbineST387398Jun 1968Operating—coming soon
3Natural Gas Steam TurbineST387398.5Jul 1972Operating—coming soon
4Natural Gas Steam TurbineST387398Dec 1977Operating—coming soon
GT1Petroleum LiquidsGT1611.8Mar 1967Operating—coming soon
ST1Natural Gas Steam TurbineST387397.7Jul 1967Operating—coming soon

Owner / operator

Operator: National Grid Generation LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
National Grid Generation LLC100.0%1,564 MW

Nearby plants

Within 80 km.
Huntington Resource Recovery Facility28 MW6.4 km
Saint Catherine of Siena Medical Center2 MW6.6 km
Kings Park Solar I2 MW9.9 km
Kings Park Solar II2 MW9.9 km
ATT Jericho1 MW10.4 km
Riverhead2 MW14.3 km