← Back to map

East Hampton

Suffolk County, New York · EIA plant ID 2512 · Operator: National Grid Generation LLC
OilPetroleum LiquidsNYISOBA: NYIS
Nameplate27MWSummer 25 MW
Generators4in service
Net generation11GWh12 mo to Dec 2025
Capacity factor5%gas/coal/oil units, summer MW
Heat rate14,210Btu/kWhfossil units, electric fuel, HHV
First online1962Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-5051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%200520102015202020254.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,00013,00014,0002005201020152020202514,210 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200114.3——
200238.4——
200320.48.3%12,581
20045.72.7%13,642
20056.32.9%13,677
20068.84.1%13,676
200718.78.7%13,778
20082310.5%13,601
200914.96.9%13,445
201014.26.6%13,718
20119.24.3%13,912
20127.93.7%14,336
20138.94.1%13,312
20146.32.9%13,051
201510.74.9%13,365
201612.35.6%13,458
20177.63.5%13,597
201813.76.2%13,479
201914.56.6%13,366
2020167.2%13,336
2021135.9%13,375
202214.86.7%13,501
202312.25.5%13,822
202411.55.2%14,194
202510.94.9%14,210

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT21.319.2Dec 1970Operating—coming soon
2Petroleum LiquidsIC22Dec 1962Operating—coming soon
3Petroleum LiquidsIC22Dec 1962Operating—coming soon
4Petroleum LiquidsIC22Dec 1962Operating—coming soon

Owner / operator

Operator: National Grid Generation LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
National Grid Generation LLC100.0%27 MW

Nearby plants

Within 80 km.
East Hampton Energy Storage Center5 MW0 km
South Hampton12 MW16 km
Kearsarge Southampton5 MW16.2 km
Greenport10 MW21.2 km
Southold14 MW21.2 km
Hawkeye Energy Greenport LLC54 MW21.2 km