East River

New York County, New York · EIA plant ID 2493 · Operator: Consolidated Edison Co-NY Inc
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Steam TurbineNYISOBA: NYIS
Nameplate716MWSummer 616 MW
Generators4in service
Net generation2,752GWh12 mo to Aug 2026
Capacity factor56%gas/coal/oil units, summer MW
Heat rate8,088Btu/kWhfossil units, electric fuel, HHV
First online1951Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202555.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,000200520102015202020258,088 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001732——
2002737.6——
2003573.421.5%13,124
2004933.234.4%12,411
20052,08845.2%11,853
20062,781.651.7%11,478
20072,803.952.5%11,661
20082,854.852.8%11,492
20092,450.345.9%11,632
20103,285.461.9%11,494
20112,746.251.2%11,526
20123,074.457.4%11,446
20133,182.359.6%11,370
20142,75451.4%10,989
20152,92853.1%11,048
20163,081.755.7%8,082
20173,093.155.3%8,033
20182,955.353.1%8,055
20192,818.850.3%8,046
20203,120.955.5%8,024
20213,180.856.8%8,038
20223,011.154.0%8,070
20233,078.755.8%8,103
20242,894.152.2%8,070
20252,753.751.1%8,112

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingNo
Net summer MW on gas306
Net summer MW on oil306
Time gas → oilunknown (EIA UNK)
Time oil → gasunknown (EIA UNK)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT180152.1Apr 2005Operating—coming soon
2Natural Gas Fired Combustion TurbineGT180153.9Apr 2005Operating—coming soon
6Natural Gas Steam TurbineST156.2132.7Nov 1951Operating—coming soon
7Natural Gas Steam TurbineST200176.8Jun 1955Operating—coming soon

Owner / operator

Operator: Consolidated Edison Co-NY Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Consolidated Edison Co-NY Inc100.0%716 MW

Nearby plants

Within 80 km.
Mount Sinai Beth Israel4 MW0.8 km
NYU Langone - Orthopedic2 MW1 km
NYC-HH-New Bellevue Hospital7 MW1.3 km
North 1st47 MW1.4 km
NYU LANGONE HEALTH34 MW2.1 km
AE-ESS NWS 1, LLC5 MW2.4 km