West CoxsackieRetirement planned
Greene County, New York · EIA plant ID 2487 · Operator: Central Hudson Gas & Elec Corp
Nameplate21MWSummer 19 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate13,691Btu/kWhfossil units, electric fuel, HHV
First online1969Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 3 | 1.8% | 14,952 |
| 2002 | 6.5 | 4.0% | 14,626 |
| 2003 | 1.2 | 0.8% | 16,683 |
| 2004 | 0.1 | 0.0% | 20,881 |
| 2005 | 0.3 | 0.2% | 14,348 |
| 2006 | 0.3 | 0.2% | 15,341 |
| 2007 | 0.3 | 0.2% | 17,045 |
| 2008 | 0.2 | 0.1% | 17,267 |
| 2009 | 0.1 | 0.1% | 16,540 |
| 2010 | 0.2 | 0.1% | 17,801 |
| 2011 | 1 | 0.5% | 15,029 |
| 2012 | 0 | 0.0% | 17,167 |
| 2013 | 0.4 | 0.2% | 15,698 |
| 2014 | 0.3 | 0.2% | 15,476 |
| 2015 | 0.1 | 0.1% | 14,902 |
| 2016 | 0.5 | 0.3% | 14,469 |
| 2017 | 0.4 | 0.2% | 13,432 |
| 2018 | 0.6 | 0.3% | 13,770 |
| 2019 | 0.8 | 0.5% | 13,784 |
| 2020 | 0.3 | 0.2% | 19,892 |
| 2021 | 0.8 | 0.4% | 12,500 |
| 2022 | 3.9 | 2.2% | — |
| 2023 | 0.5 | 0.3% | 14,445 |
| 2024 | 0.4 | 0.2% | 15,000 |
| 2025 | 1.1 | 0.7% | 13,691 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo3,878 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas20
Net summer MW on oil20
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | GT | 21.3 | 19.4 | Dec 1969 | Operating · retirement planned | Apr 2027 | coming soon |
Owner / operator
Operator: Central Hudson Gas & Elec Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Central Hudson Gas & Elec Corp | 100.0% | 21 MW |
Nearby plants
Within 80 km.
| DOCCS Greene | 5 MW | 2.8 km |
| Coxsackie Solar | 5 MW | 3.3 km |
| Flint Mine Solar | — | 4.8 km |
| Stuyvesant Falls | 6 MW | 6.7 km |
| Orioles Community Solar | 6 MW | 8.4 km |
| Athens Generating Plant | 1,222 MW | 9.1 km |