← Back to map

Glendive GT

Dawson County, Montana · EIA plant ID 2176 · Operator: Montana-Dakota Utilities Co
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelMISOBA: MISO
Nameplate84MWSummer 75 MW
Generators2in service
Net generation16GWh12 mo to Dec 2025
Capacity factor2%gas/coal/oil units, summer MW
Heat rate11,498Btu/kWhfossil units, electric fuel, HHV
First online1979Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%3%200520102015202020252.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,0002005201020152020202511,498 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20017.4——
20024.5——
200316.33.1%12,871
20049.71.5%13,434
20058.61.2%16,692
20066.50.9%18,512
200712.71.8%16,597
20083.20.5%17,791
20091.90.3%22,511
201071.0%16,226
201115.42.3%13,180
201210.61.6%13,589
20131.80.3%19,556
20141.90.3%19,915
20151.20.2%20,141
20166.30.9%15,510
201720.3%15,729
20181.80.3%19,983
20191.50.2%25,175
2020-0.3-0.0%—
202114.92.3%13,094
20221.10.2%29,794
20231.50.2%24,187
20242.60.4%20,189
202515.92.4%11,498

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo9,014 MMBtu
Last month with liquid burnDec 2025
Switch while operatingNo
Net summer MW on gas75
Net summer MW on oil71
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT-2Natural Gas Fired Combustion TurbineGT4340.1May 2003Operating—coming soon
GT1Natural Gas Fired Combustion TurbineGT40.734.8Jun 1979Operating—coming soon
IC1Petroleum LiquidsIC1.82Feb 2005not_current—coming soon

Owner / operator

Operator: Montana-Dakota Utilities Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Montana-Dakota Utilities Co100.0%84 MW

Nearby plants

Within 80 km.
No other plants within 80 km.