Windom

Cottonwood County, Minnesota · EIA plant ID 2023 · Operator: City of Windom
OilPetroleum LiquidsMISOBA: MISO

×3 MW oil retired since 2020 (latest Apr 2022)

Nameplate12MWSummer 11 MW
Generators5in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate10,625Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060MWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%1%1%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,0002005201020152020202510,625 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20020——
20030.50.7%8,946
200400.1%12,000
20050.40.5%10,367
20060.20.3%13,724
20070.20.3%9,957
200800.1%13,194
200900.0%12,111
201000.0%13,000
201100.0%12,350
201200.0%14,167
201300.0%11,867
201400.1%10,971
201500.0%11,333
201600.0%12,947
201700.0%7,133
20180.10.1%12,741
201900.1%12,267
202000.0%14,545
20210.10.1%5,797
202200.1%10,000
20230.10.1%9,536
202400.0%13,435
202500.0%10,625

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CAT2Petroleum LiquidsIC1.81.7Apr 2001Operating (Standby / backup)—coming soon
CAT3Petroleum LiquidsIC1.81.7Apr 2001Operating (Standby / backup)—coming soon
CAT4Petroleum LiquidsIC1.81.7Apr 2001Operating (Standby / backup)—coming soon
CAT5Petroleum LiquidsIC3.12.8Nov 2024Operating (Standby / backup)—coming soon
CAT6Petroleum LiquidsIC3.12.8Nov 2024Operating (Standby / backup)—coming soon
2APetroleum LiquidsIC1.81.7Apr 2001not_current—coming soon
3Petroleum LiquidsIC1.81.7Apr 2001not_current—coming soon
4Petroleum LiquidsIC1.81.7Apr 2001not_current—coming soon
GT1Petroleum LiquidsGT32.5Jun 1980Retired Apr 2022—coming soon

Owner / operator

Operator: City of Windom. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Windom100.0%12 MW

Nearby plants

Within 80 km.
Windom Wind Project16 MW10.1 km
Odell Wind Farm200 MW14.7 km
Mountain Lake1 MW15.9 km
Odin Wind Farm LLC20 MW16.3 km
Elm Creek Wind LLC99 MW18.3 km
Lakefield Wind Project LLC206 MW21.7 km