← Back to map

Vestaburg

Montcalm County, Michigan · EIA plant ID 1881 · Operator: Wolverine Power Supply Coop
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelMISOBA: MISO
Nameplate24MWSummer 18 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate18,784Btu/kWhfossil units, electric fuel, HHV
First online1972Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%3%200520102015202020252.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,00014,00016,00018,0002005201020152020202518,784 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20017.3——
20023.6——
20032.40.9%14,781
20041.10.5%16,041
20052.61.1%18,002
20061.30.6%18,500
200720.9%17,875
20080.70.3%17,427
20090.70.3%18,485
20101.60.7%17,457
20111.80.9%17,466
20123.71.7%16,747
20131.40.6%17,336
20140.70.3%17,165
20150.90.4%17,023
20166.83.2%16,225
20171.50.8%16,382
20181.10.7%13,685
20191.20.7%17,296
20202.31.4%16,588
20212.91.8%15,954
20224.32.7%16,866
20231.40.9%16,767
20242.31.4%16,912
20254.42.7%18,784

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo107 MMBtu
Last month with liquid burnDec 2023
Switch while operatingYes
Net summer MW on gas19
Net summer MW on oil19
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
8Natural Gas Fired Combustion TurbineGT23.718.4Jul 1972Operating—coming soon
2Petroleum LiquidsIC0.30.3Jan 1939Retired Feb 2007—coming soon
4Petroleum LiquidsIC0.70.7Jan 1939Retired Feb 2007—coming soon
5Petroleum LiquidsIC0.70.7Jan 1941Retired Feb 2007—coming soon
6Petroleum LiquidsIC33Jan 1959Retired Jun 2017—coming soon
7Petroleum LiquidsIC33Jan 1960Retired Jun 2017—coming soon

Owner / operator

Operator: Wolverine Power Supply Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wolverine Power Supply Coop100.0%24 MW

Nearby plants

Within 80 km.
Freshwater Solar, LLC—12.4 km
Freshwater Solar II, LLC—15 km
Pine River Solar Park80 MW18.9 km
Pine River Wind Park161 MW22.2 km
Central Michigan University5 MW23.7 km
Renaissance Power Plant782 MW24.6 km