White Rapids
Menominee County, Michigan · EIA plant ID 1786 · Operator: Wisconsin Electric Power Co
Nameplate8MWSummer 7 MW
Generators3in service
Net generation33GWh12 mo to Dec 2025
Capacity factor52%hydro units, summer MW
Heat rate—thermal plants only
First online1927
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 30.6 | 94.5% | — |
| 2002 | 36.6 | 113.0% | — |
| 2003 | 30.9 | 98.0% | — |
| 2004 | 33.4 | 105.5% | — |
| 2005 | 28.8 | 91.4% | — |
| 2006 | 27.9 | 88.5% | — |
| 2007 | 23.9 | 73.6% | — |
| 2008 | 22.9 | 70.6% | — |
| 2009 | 24.1 | 74.3% | — |
| 2010 | 29.4 | 176.8% | — |
| 2011 | 31.2 | 137.2% | — |
| 2012 | 24.6 | 107.8% | — |
| 2013 | 31.3 | 49.7% | — |
| 2014 | 36.8 | 58.4% | — |
| 2015 | 37.8 | 59.9% | — |
| 2016 | 40.5 | 64.0% | — |
| 2017 | 48.4 | 76.7% | — |
| 2018 | 39.1 | 62.0% | — |
| 2019 | 38.4 | 60.9% | — |
| 2020 | 43.2 | 54.6% | — |
| 2021 | 31.8 | 50.4% | — |
| 2022 | 31.7 | 50.2% | — |
| 2023 | 29.8 | 47.2% | — |
| 2024 | 29.8 | 47.1% | — |
| 2025 | 32.7 | 51.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 3 | 2.6 | Oct 1927 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 3 | 2 | Oct 1927 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 2 | 2.6 | Oct 1927 | Operating | — | coming soon |
Owner / operator
Operator: Wisconsin Electric Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wisconsin Electric Power Co | 100.0% | 8 MW |
Nearby plants
Within 80 km.
| Chalk Hill | 8 MW | 3.5 km |
| Grand Rapids | 8 MW | 18.5 km |
| Norway (MI) | 6 MW | 29.2 km |
| Sandstone Rapids | 4 MW | 34.6 km |
| Johnson Falls | 3 MW | 35.4 km |
| Little Quinnesec Falls Hydro Project | 9 MW | 35.5 km |