← Back to map

Placid 12

Oakland County, Michigan · EIA plant ID 1737 · Operator: DTE Electric Company
OilPetroleum LiquidsMISOBA: MISO
Nameplate14MWSummer 14 MW
Generators5in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate28,115Btu/kWhfossil units, electric fuel, HHV
First online1970Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-3-2-10GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%200520102015202020250.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
15,00020,00025,00030,0002005201020152020202528,115 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.80.7%20,110
20020.10.1%—
20030.30.3%22,311
2004-0.4-0.4%—
2005-0.1-0.1%—
200600.0%—
2007-12.3-10.1%—
2008-0.6-0.5%—
2009-0.4-0.4%—
2010-12.3-11.7%—
2011-0.2-0.2%—
20120.20.2%28,830
2013-0-0.0%—
20140.20.2%—
2015-0.3-0.3%—
20160.20.1%—
2017-0.1-0.1%—
2018-0.1-0.1%—
2019-0.1-0.1%—
202000.0%—
20210.60.5%17,725
2022-0.2-0.1%—
2023-0.3-0.2%—
2024-0.2-0.2%—
20250.20.2%28,115

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC2.72Nov 1970Operating—coming soon
2Petroleum LiquidsIC2.73Dec 1970Operating—coming soon
3Petroleum LiquidsIC2.73Nov 1970Operating—coming soon
4Petroleum LiquidsIC2.73Nov 1970Operating—coming soon
5Petroleum LiquidsIC2.73Nov 1970Operating—coming soon

Owner / operator

Operator: DTE Electric Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
DTE Electric Company100.0%14 MW

Nearby plants

Within 80 km.
Putnam (MI)14 MW0.1 km
Eagle Valley (MI)3 MW15.9 km
Hancock122 MW17.9 km
Parkedale Pharmaceuticalsretired28.2 km
William Beaumont Hospitalretired30.5 km
Grand Blanc Generating Station7 MW31.1 km