Cleary Flood Hybrid

Bristol County, Massachusetts · EIA plant ID 1682 · Operator: City of Taunton
Natural gasBatteriesNatural Gas Fired Combined Cycle⛽ Dual-fuelISONEBA: ISNE

×28 MW oil retired since 2020 (latest Dec 2020)

Nameplate121MWSummer 106 MW
Generators3in service
Net generation54GWh12 mo to Dec 2025
Capacity factor6%gas/coal/oil units, summer MW
Heat rate11,138Btu/kWhfossil units, electric fuel, HHV
First online1975Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-100102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%200520102015202020256.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00011,00012,0002005201020152020202511,138 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001178——
2002184.5——
2003113.29.7%10,842
200457.34.9%10,832
200552.94.5%10,702
200615.61.3%11,609
200727.62.4%11,828
200838.53.3%12,521
200930.32.6%11,333
201086.77.4%11,353
201157.34.9%11,672
201283.87.1%11,213
201380.47.0%11,446
2014139.712.2%11,190
2015168.214.7%10,831
201677.76.8%11,391
201757.75.0%11,164
201876.96.7%11,170
201933.63.0%11,432
202048.74.3%11,160
20219.51.1%12,065
202224.52.7%11,325
202349.65.5%11,224
2024132.514.7%10,887
202554.26.0%11,138

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo69,503 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas103
Net summer MW on oil103
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
9ANatural Gas Fired Combined CycleCT2318Oct 1976Operating—coming soon
BS1BatteriesBA32.9Mar 2020Operating—coming soon
CA9Natural Gas Fired Combined CycleCA9585Dec 1975Operating—coming soon
8Petroleum LiquidsST28.326Jun 1966Retired Dec 2020—coming soon

Owner / operator

Operator: City of Taunton. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Taunton - (MA)84.2%102 MW
Town of North Attleborough - (MA)8.9%11 MW
Town of Hudson - (MA)4.4%5 MW
City of Taunton2.5%3 MW

Nearby plants

Within 80 km.
West Water Street10 MW2.1 km
Southern Sky Renew Energy Berkley LLC3 MW3.3 km
Padelford Solar2 MW3.7 km
Dighton Power Plant200 MW4.1 km
Manheim New England3 MW5 km
MA-Dighton-A4 MW5.7 km