Bar MillsRetired

York County, Maine · EIA plant ID 1481 · Operator: Brookfield White Pine Hydro LLC
HydroISONEBA: ISNE

×4 MW hydro retired since 2020 (latest Jan 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20012003200520072009201120132015201720192021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200111.635.0%—
200232.492.6%—
200318.552.9%—
200417.349.2%—
200518.953.9%—
200623.466.7%—
200714.942.4%—
200824.469.4%—
200922.463.8%—
20102468.4%—
201117.449.6%—
201216.847.9%—
201313.438.3%—
201411.532.9%—
2015514.2%—
20166.318.0%—
20175.215.0%—
201800.0%—
201900.0%—
202000.0%—
20210——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY22Jan 1956Retired Jan 2021—coming soon
2Conventional HydroelectricHY22Jan 1956Retired Jan 2021—coming soon

Owner / operator

Operator: Brookfield White Pine Hydro LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Emery Meadow Solar Station—3.4 km
Skelton17 MW4.8 km
West Buxton8 MW7.1 km
Bonny Eagle15 MW9.5 km
BWC Beech Ridge Brook, LLC5 MW11.6 km
Gorham Solar 1 (CSG)5 MW12.5 km