← Back to map

Barkley

Lyon County, Kentucky · EIA plant ID 1371 · Operator: USCE-Nashville District
HydroConventional HydroelectricBA: TVA
Nameplate130MWSummer 148 MW
Generators4in service
Net generation625GWh12 mo to Dec 2025
Capacity factor48%hydro units, summer MW
Heat rate—thermal plants only
First online1966

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300400GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%2005201020152020202548.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012,021.5155.9%—
20021,817.8140.2%—
200393171.8%—
2004881.267.8%—
2005705.154.4%—
2006641.249.5%—
2007338.326.1%—
2008379.229.2%—
200981562.9%—
2010506.339.1%—
2011381.629.4%—
2012343.226.4%—
2013486.937.6%—
2014601.146.4%—
201554442.0%—
201648637.4%—
2017812.962.7%—
2018637.849.2%—
201957244.1%—
2020775.559.7%—
2021619.147.8%—
2022628.448.5%—
2023500.538.6%—
2024590.645.4%—
2025624.948.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY32.537Jan 1966Operating—coming soon
2Conventional HydroelectricHY32.537Feb 1966Operating—coming soon
3Conventional HydroelectricHY32.537Mar 1966Operating—coming soon
4Conventional HydroelectricHY32.537Mar 1966Operating—coming soon

Owner / operator

Operator: USCE-Nashville District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
USCE-Nashville District100.0%130 MW

Nearby plants

Within 80 km.
Kentucky Dam219 MW4.4 km
Calvert City27 MW12.2 km
Ashwood Solar I86 MW12.5 km
Marshall Energy Facility688 MW15.5 km
Smithland Hydroelectric Plant76 MW24.1 km
PPS Power Plant No 1120 MW35.1 km