← Back to map

Graettinger

Palo Alto County, Iowa · EIA plant ID 1142 · Operator: City of Graettinger - (IA)
OilPetroleum LiquidsMISOBA: MISO

×1 MW oil retired since 2020 (latest May 2024)

Nameplate3MWSummer 3 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate15,714Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020MWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%1%1%200520102015202020250.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,00014,00016,0002005201020152020202515,714 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200200.1%10,833
20030.10.3%10,090
200400.1%10,963
200500.0%10,771
200600.1%10,651
200700.0%10,726
200800.1%11,327
200900.0%10,222
201000.1%10,875
201100.1%12,538
201200.0%12,000
201300.0%11,700
201400.1%10,296
201500.0%15,429
201600.0%13,500
201700.1%9,750
201800.1%11,791
20190.10.3%10,642
202000.0%9,333
202100.1%10,857
20220.10.3%12,495
20230.30.8%14,153
20240.10.2%14,492
202500.2%15,714

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5Petroleum LiquidsIC1.11.1Dec 1990Operating—coming soon
6Petroleum LiquidsIC22Feb 2002Operating—coming soon
4Petroleum LiquidsIC0.50.5Aug 1957Retired May 2024—coming soon

Owner / operator

Operator: City of Graettinger - (IA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Graettinger - (IA)100.0%3 MW

Nearby plants

Within 80 km.
Palo Alto Wind Farm340 MW16.8 km
Iowa Lakes Community College Wind Farm2 MW17 km
Poet Bioprocessing Emmetsburg4 MW18.6 km
Estherville16 MW19.6 km
Crosswind Energy Project21 MW25.6 km
Iowa Lakes Superior Wind Farm11 MW29.5 km