San Diego County, California · EIA plant ID 10720 · Operator: Hawthorne Power Systems
Natural gasNatural Gas Internal Combustion EngineCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators2in service
Net generation14GWh12 mo to Dec 2025
Capacity factor41%gas/coal/oil units, summer MW
Heat rate10,675Btu/kWhfossil units, electric fuel, HHV
First online2012Runs as intermediate

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh200120032005200720092013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202541.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,0002005201020152020202510,675 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200121.286.6%7,990
200221.677.6%8,565
200322.379.5%8,689
200423.583.5%7,150
200521.677.1%7,150
200621.784.9%7,150
20072078.7%7,008
200819.375.8%7,134
200920.681.2%7,133
201021.182.9%7,125
2012326.9%7,619
201312.236.6%7,449
20149.528.4%7,030
201511.434.4%7,604
20167.823.5%12,076
20171339.1%—
201811.534.6%11,692
201912.136.3%12,171
20201235.8%12,181
202110.531.5%12,285
202210.732.1%11,307
20238.826.3%11,605
20249.127.3%12,286
202513.741.2%10,675

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
287Natural Gas Internal Combustion EngineIC1.71.7Sep 2012Operating—coming soon
333Natural Gas Internal Combustion EngineIC2.12.1Sep 2012Operating (Out of service, expected back within the year)—coming soon
85Natural Gas Internal Combustion EngineIC0.80.7Feb 1989Retired Nov 2011—coming soon
88Natural Gas Internal Combustion EngineIC0.80.7Feb 1989Retired Nov 2011—coming soon
95Natural Gas Internal Combustion EngineIC0.80.8Feb 1989Retired Nov 2011—coming soon
96Natural Gas Internal Combustion EngineIC0.80.7Feb 1989Retired Nov 2011—coming soon

Owner / operator

Operator: Hawthorne Power Systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hawthorne Power Systems100.0%4 MW

Nearby plants

Within 80 km.
L3 Harris San Diego—0.6 km
EnerSmart Mesa Heights Sub Station—1.1 km
Kearny Mesa Storage LLC1 MW1.4 km
Kearny North Energy Storage10 MW1.6 km
Kearny South Energy Storage10 MW1.7 km
County of San Diego COC Hybrid2 MW1.8 km