CES Placerita Power PlantOut of service

Los Angeles County, California · EIA plant ID 10677 · Operator: AES Placerita Inc
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate90MWSummer 69 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1988

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20012002200320042005200620072008

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%2003200420052006200720082009

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00010,20010,40010,60010,800200320042005200620072008
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001168.9——
20029.8——
200343.84.3%10,766
2004706.9%10,674
200521.72.2%10,516
200613.91.4%10,501
200711.61.1%10,174
200800.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UNT2Natural Gas Fired Combined CycleCT6046Jun 1988Operating (Out of service)—coming soon
UNT3Natural Gas Fired Combined CycleCA3023Jun 1988Operating (Out of service)—coming soon
UNT1Natural Gas Fired Combined CycleCT6046Jun 1988Retired Jan 2008—coming soon

Owner / operator

Operator: AES Placerita Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Placerita Inc100.0%90 MW

Nearby plants

Within 80 km.
Berry Placerita Cogen43 MW0.6 km
Sunshine Gas Producers23 MW5.2 km
Placerita ESS88 MW5.7 km
Castaic Lake Phase II5 MW6 km
Foothill9 MW6.9 km
Olive View Medical Center6 MW7.8 km