← Back to map

Iowa Hydro LLC

Jackson County, Iowa · EIA plant ID 1067 · Operator: Zero6 Energy Hydro
HydroConventional HydroelectricMISOBA: MISO
Nameplate1MWSummer 1 MW
Generators2in service
Net generation6GWh12 mo to Aug 2026
Capacity factor57%hydro units, summer MW
Heat rate—thermal plants only
First online1924

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202556.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20015.350.3%—
20025.148.1%—
2003440.2%—
20042.424.0%—
20051.818.4%—
20062.524.6%—
20075.855.5%—
20083.432.2%—
20097.773.6%—
20109.186.3%—
20118.580.4%—
20125.653.0%—
2013657.5%—
20146.360.0%—
20156.460.8%—
2016875.9%—
2017766.9%—
20186.662.7%—
20198.479.5%—
20207.975.2%—
20216.258.6%—
20225.350.8%—
20234.341.0%—
20245.249.6%—
20255.855.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY0.60.6Jan 1924Operating—coming soon
2Conventional HydroelectricHY0.60.6Jan 1924Operating—coming soon

Owner / operator

Operator: Zero6 Energy Hydro. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Zero6 Energy Hydro100.0%1 MW

Nearby plants

Within 80 km.
Maquoketa 28 MW3.1 km
Maquoketa 124 MW4.7 km
Preston (IA)4 MW25.1 km
Hawkeye Solar, LLC—26.1 km
Hawkeye Solar II, LLC—26.1 km
Bellevue10 MW30.6 km