Lederle Laboratories
Rockland County, New York · EIA plant ID 10521 · Operator: Veolia NA - Municipal & Commercial Business
Nameplate23MWSummer 22 MW
Generators5in service
Net generation139GWh12 mo to Aug 2026
Capacity factor73%gas/coal/oil units, summer MW
Heat rate5,863Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 166.1 | — | — |
| 2002 | 172.6 | — | — |
| 2003 | 131.2 | 64.0% | 12,967 |
| 2004 | 162 | 78.8% | 8,819 |
| 2005 | 163 | 79.5% | 8,819 |
| 2006 | 134.1 | 65.4% | 8,819 |
| 2007 | 150 | 73.2% | 8,819 |
| 2008 | 141.9 | 69.1% | 8,819 |
| 2009 | 137 | 66.8% | 8,819 |
| 2010 | 147.9 | 75.7% | 8,819 |
| 2011 | 140.1 | 71.7% | 8,819 |
| 2012 | 147.2 | 75.1% | 8,819 |
| 2013 | 149.9 | 76.7% | 8,819 |
| 2014 | 127.9 | 65.5% | 8,819 |
| 2015 | 144.8 | 75.2% | 8,819 |
| 2016 | 124.3 | 65.2% | 5,752 |
| 2017 | 107.3 | 56.5% | 7,041 |
| 2018 | 120.4 | 63.3% | 5,863 |
| 2019 | 118.8 | 62.5% | 5,834 |
| 2020 | 122.5 | 64.3% | 5,863 |
| 2021 | 129.4 | 68.1% | 5,863 |
| 2022 | 142.1 | 74.8% | 5,863 |
| 2023 | 122 | 64.2% | 5,863 |
| 2024 | 149.8 | 78.6% | 5,863 |
| 2025 | 149 | 78.4% | 5,863 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo78,324 MMBtu
Last month with liquid burnMar 2026
Switch while operatingYes
Net summer MW on gas22
Net summer MW on oil22
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 3A | Natural Gas Fired Combined Cycle | CA | 1.5 | 1.5 | Dec 1998 | Operating | — | coming soon |
| GEN1 | Natural Gas Fired Combined Cycle | CT | 8.3 | 8.3 | Jan 1991 | Operating | — | coming soon |
| GEN2 | Natural Gas Fired Combined Cycle | CT | 8.3 | 8.3 | Jan 1991 | Operating | — | coming soon |
| GEN3 | Natural Gas Fired Combined Cycle | CA | 2.2 | 2.2 | Jul 1990 | Operating | — | coming soon |
| TG4 | Natural Gas Fired Combined Cycle | CA | 3.1 | 1.4 | Jul 1997 | Operating | — | coming soon |
Owner / operator
Operator: Veolia NA - Municipal & Commercial Business. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Veolia NA - Municipal & Commercial Business | 100.0% | 23 MW |
Nearby plants
Within 80 km.
| 100 Brook Hill Drive Solar | 2 MW | 3.4 km |
| Clarkstown Landfill Solar Facility | 2 MW | 6.1 km |
| Montefiore Nyack Hospital | 2 MW | 8.5 km |
| Good Samaritan Hospital | 2 MW | 10.5 km |
| Bergenmand Solar Partners, LLC Mahwah | 1 MW | 11.1 km |
| NY3 Battery | 3 MW | 12.9 km |