Bernalillo County, New Mexico · EIA plant ID 10339 · Operator: Albuquerque City of
OtherNatural Gas Internal Combustion EngineOther Waste BiomassBA: PNM
Nameplate7MWSummer 6 MW
Generators4in service
Net generation23GWh12 mo to Aug 2026
Capacity factor43%other units, summer MW
Heat rate11,567Btu/kWhfossil units, electric fuel, HHV
First online1987

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202543.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,0002005201020152020202511,567 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200118.796.8%—
200224.576.3%9,590
200347.10.0%8,053
200400.0%—
200519.98.3%7,110
20063539.0%7,110
20072228.5%7,110
200826.333.6%6,968
200939.260.1%7,110
201024.124.4%7,110
201125.216.8%7,110
201228.725.4%7,110
201332.333.0%7,110
201434.773.6%7,110
201532.1101.6%7,110
201636.587.8%15,826
201734.688.0%15,826
201834.284.1%15,826
201929.835.9%13,667
202013.231.3%13,724
202120.341.5%11,866
20221820.0%11,849
20232046.7%10,863
202418.347.6%9,748
202517.948.0%10,829

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Internal Combustion EngineIC2.22.1Nov 2002Operating—coming soon
GEN2Other Waste BiomassIC2.22.1Nov 2002Operating—coming soon
GEN3Natural Gas Internal Combustion EngineIC1.11.1Feb 1987Operating—coming soon
GEN4Other Waste BiomassIC1.11.1Feb 1987Operating—coming soon

Owner / operator

Operator: Albuquerque City of. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Albuquerque City of100.0%7 MW

Nearby plants

Within 80 km.
Rio Bravo150 MW2.6 km
Prosperity Energy Storage Facility Hybrid1 MW3.4 km
Netflix ABQ System B2 MW5.7 km
Netflix ABQ System A3 MW5.7 km
Corazon Energy Storage—6.7 km
South Valley Solar Energy Center10 MW6.9 km