Brasfield
Chesterfield County, Virginia · EIA plant ID 10155 · Operator: Appomattox River Associates LP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor24%hydro units, summer MW
Heat rate—thermal plants only
First online1993
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 7.1 | 28.1% | — |
| 2002 | 6.5 | 25.8% | — |
| 2003 | 18.9 | 74.4% | — |
| 2004 | 12.1 | 47.4% | — |
| 2005 | 12.1 | 47.8% | — |
| 2006 | 11.9 | 46.7% | — |
| 2007 | 8.6 | 33.8% | — |
| 2008 | 9.6 | 37.9% | — |
| 2009 | 10.6 | 41.7% | — |
| 2010 | 9.8 | 38.5% | — |
| 2011 | 10.2 | 40.0% | — |
| 2012 | 5.4 | 21.2% | — |
| 2013 | 11.4 | 44.9% | — |
| 2014 | 9.9 | 39.1% | — |
| 2015 | 10.6 | 41.6% | — |
| 2016 | 10.6 | 41.5% | — |
| 2017 | 6 | 23.8% | — |
| 2018 | 11.1 | 43.6% | — |
| 2019 | 10.8 | 42.4% | — |
| 2020 | 14.7 | 57.7% | — |
| 2021 | 9.6 | 37.6% | — |
| 2022 | 7.2 | 28.2% | — |
| 2023 | 6.8 | 26.8% | — |
| 2024 | 9.6 | 37.8% | — |
| 2025 | 6.1 | 23.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 2.9 | 2.9 | Sep 1993 | Operating | — | coming soon |
Owner / operator
Operator: Appomattox River Associates LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Appomattox River Associates LP | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Boydton Plank Road Cogen Plant | retired | 5.9 km |
| Petersburg - VA 0224 (Murphy) | — | 8.2 km |
| Chester Solar Technology Park, LLC | — | 11.9 km |
| Chesterfield Landfill Gas | 14 MW | 14.8 km |
| HCE Reams Solar, LLC | 5 MW | 15 km |
| Caden Energix Rives Road LLC | 20 MW | 17.2 km |